For access-control planning in Jordan, a door and gate schedule provides a common reference for architectural, electrical and security teams. Start with the actual opening identifiers rather than a general equipment count.
What to prepare for the project review
- Assign an identifier and location to every controlled opening.
- Record operating hours, user groups and required coordination with other disciplines.
- Flag drawings or operating decisions that remain unapproved.
Coordinate the decisions before release
Invite the owner, security designer and installation team to review the access and operating requirements together. Identify any specialist assessment needed for the proposed protection objectives. Keep routine access management and specialist protective requirements clearly distinguished in the scope.
The practical project deliverable
The schedule should show what is confirmed and what is provisional, helping the quotation and subsequent design review address the same set of openings.